ArcGIS REST Services Directory Login | Get Token
JSON

ItemInfo

Item Information

snippet: Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done.
summary: Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done.
accessInformation: http://ddot.dc.tov
thumbnail:
maxScale: 5000
typeKeywords: []
description: <DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done. This also includes refunds for deposits and issuing Notice of Violation (NOV).</SPAN></P></DIV></DIV></DIV>
licenseInfo: <DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>This work is licensed under a </SPAN><A href="http://creativecommons.org/licenses/by/4.0/"><SPAN>Creative Commons Attribution 4.0 International License</SPAN></A><SPAN>.</SPAN></P></DIV></DIV></DIV>
catalogPath:
title: Permit Inspections
type:
url:
tags: ["ddot","nov2017","permit","construction","inspection","transportation","washington dc","dc","dcgis","district of columbia","public space"]
culture: en-US
portalUrl:
name:
guid:
minScale: 150000000
spatialReference: