{ "culture": "en-US", "name": "", "guid": "", "catalogPath": "", "snippet": "Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done.", "description": "
Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done. This also includes refunds for deposits and issuing Notice of Violation (NOV).<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>",
"summary": "Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done.",
"title": "Permit Inspections",
"tags": [
"ddot",
"nov2017",
"permit",
"construction",
"inspection",
"transportation",
"washington dc",
"dc",
"dcgis",
"district of columbia",
"public space"
],
"type": "",
"typeKeywords": [],
"thumbnail": "",
"url": "",
"minScale": 150000000,
"maxScale": 5000,
"spatialReference": "",
"accessInformation": "http://ddot.dc.tov",
"licenseInfo": " This work is licensed under a <\/SPAN>Creative Commons Attribution 4.0 International License<\/SPAN><\/A>.<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>",
"portalUrl": ""
}