{ "culture": "en-US", "name": "", "guid": "", "catalogPath": "", "snippet": "Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done.", "description": "

Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done. This also includes refunds for deposits and issuing Notice of Violation (NOV).<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>", "summary": "Permit inspections are mostly scheduled during approval (pre-inspection), after work completion (final inspection) to check if the restoration of any cut is properly done.", "title": "Permit Inspections", "tags": [ "ddot", "nov2017", "permit", "construction", "inspection", "transportation", "washington dc", "dc", "dcgis", "district of columbia", "public space" ], "type": "", "typeKeywords": [], "thumbnail": "", "url": "", "minScale": 150000000, "maxScale": 5000, "spatialReference": "", "accessInformation": "http://ddot.dc.tov", "licenseInfo": "